← All help articles

Help

Projects and the Points log

Group the meetings of one job and carry every open point from meeting to meeting.

A project groups the meetings of one job - a drydock, a repowering, a weekly committee - so the same open points are carried forward instead of being raised again.

Create a project

You can create a project in three places:

  • the Projects screen;
  • the New meeting window;
  • Move this meeting.

A meeting can be moved into, out of or between projects. Nothing is deleted, and Undo brings the move back.

Start today's meeting

Start today's meeting from the project. The new meeting opens with the open points as agenda item 1, the regular participants, and a brief of what changed since the last meeting.

The Points tab

Every point has a number (for example MVX-001), an owner, a due date, a status and a history.

  • Statuses: Open, In progress, On hold, Done, Cancelled.
  • On hold and Cancelled need a reason.
  • Overdue is shown automatically; On hold is never marked overdue.

With Highlight discussed points switched on, Watchkeeper marks existing open points as Discussed while the meeting runs. Hover over the mark to see the supporting sentence and its time. Nothing is suggested or changed during the meeting: no status, point or new-point suggestion is made. The Discussed sentences become hints for the reasoning pass after the meeting. You can add a point by hand at any time.

Review points after the meeting

Review points is step 4 of the fixed after-meeting sequence. After the clean-up, merge and your review of words and names, one reasoning pass reads the whole corrected meeting with the Points log and the Discussed sentences as hints. It suggests status changes, notes and new points, each with the sentence it came from.

Review points opens after that pass. Accept, reject or edit each suggestion, then confirm to update the log. Nothing changes without your confirmation. The final summary and minutes are written next, with one points table carried forward; points closed since the last meeting print once.

Register and reports

Export the project register to Excel (summary, one sheet per status, history; subject in its own column) or PDF. Weekly and monthly progress reports are available in Word or PDF.

What each level can do

Projects stay readable and exportable on every level. Running project meetings, the Points tab and the AI suggestions need Premium; a higher level can be tried for up to 3 days from Pro. See the comparison on the Pricing page.

Next: After the meeting: review first.